N-600K at San Diego Field Office
N-600K is processed by USCIS.
Verified from USCIS on 2026-06-05
How N-600K compares to other forms at the San Diego Field Office
San Diego processes I-485 (adjustment of status), N-400 (naturalization), and N-600 (certificate of citizenship) alongside N-600K. I-485 sits at 9.0 to 19.0 months and N-400 at 9.5 to 13.0. N-600 runs 23.5 to 27.5 months, the highest ceiling. N-600K runs 18.5 to 19.0 months, a half-month band that is the tightest range at the office. That floor opens 9 months later than the median sibling floor of 9.5. The widest sibling spread of 10 months is more than double the N-600K range.
Get notified when N-600K processing time changes
Free alerts. No spam. Unsubscribe anytime.
Calculator
When will your N-600K at San Diego Field Office likely be processed?
Enter your date and get a predicted window based on current processing times.
Frequently Asked Questions
How long does N-600K take at San Diego Field Office?
Current processing time for N-600K at San Diego Field Office is 23 months to 29 months, based on the latest data from USCIS.
When was N-600K processing time data last updated?
The data was last updated on 2026-06-05, sourced from USCIS.
What factors affect N-600K processing time?
Processing times vary based on application volume, case complexity, security checks, and the completeness of submitted documentation. Times shown are estimates and individual cases may differ.
